Bouwjaar: 2022
Wateroppervlakte:
- Oppervlakte zwemgedeelte: 29 m²
- Oppervlakte regeneratiegedeelte: 46 m²
- Totale oppervlakte: 75 m²
Waterdiepte: 1,5 m
Folie: groen
Overig:
PhosTec Upstream V50
Ontwerp en uitvoering:
Fresner Garten- und Landschaftsbau GmbH
AT-8962 Michaelerberg
In this project, a swimming pond was created in which the swimming area was completely covered with natural stone. Luserna gneiss was used, which contributes especially to the natural appearance. Special details, such as the floor slabs laid in Roman pattern or the wall slabs at the same height as the respective wall without a transverse joint, dis tinguish the facility. The water is wonderfully clear and has a colour all of its own. The vegetation in the regeneration zone has established itself in the first year, although it is still somewhat sparse. The customers enjoy their holiday home with the Swimming Pond in the summer in Austria.