Conversion of Swimming Pond into natural pool

Woonbad na de verbouwing van het natuurbad

Feiten


Bouwjaar: 2022
Wateroppervlakte:
- Oppervlakte zwemgedeelte: 36 m²
- Totale oppervlakte: 36 m²
Waterdiepte: 1,5 m
Overig:
©Carolin Tietz

Ontwerp en uitvoering:
Schleitzer baut Gärten creativ & innovativ GmbH
DE-80999 München

Conversion of Swimming Pond into natural pool


The wish for a new design of the Swimming Pond, which was already getting on in years, was the customer‘s motivation to contact us again. A complete renovation of the Swimming Pond became the goal of the project. The dry-installed pumps were replaced by the new technical components, an underfloor roller blind was integrated into the swimming area and new recreation areas were created from the regeneration area. During a sauna session, let your gaze wander into nature as well as over the Living Pool and forget the stressful daily work routine for a moment. An outdated swimming pond that required a lot of maintenance has been transformed into an energy-efficient, modern wellness area for young and old.


De oude zwemvijver vóór de renovatie met regeneratiezone
Uitzicht op het saunahuis en het woonzwembad
Droomterras met nieuw verbouwd woonzwembad

Catalogus bestellen



Video's bekijken