Swimming training at the farm

swimming-training-at-the-farm

Feiten


Bouwjaar: 2018
Wateroppervlakte:
- Oppervlakte zwemgedeelte: 100 m²
- Oppervlakte regeneratiegedeelte: 90 m²
- Totale oppervlakte: 190 m²
Waterdiepte: 1,8 m
Folie: grün
Overig:
additional Kombibox 50, automatic level control, 3 x Astel headlights

Ontwerp en uitvoering:
Biotop Wassergestaltung T&P GmbH
AT-3411 Weidling

Swimming training at the farm


From the very first contact with the owner family, it became clear that something big was to be built on this newly acquired pumpkin field, which was right next to their own farm. The eldest daughter was in the swimming club, but suffered during her daily training from the chlorinated water. So the idea of a 25-metre-long Swimming Pond in masonry construction was born. During the planning phase, a feel-good aura developed for the whole family. With the Swimming Pond as the centrepiece, the garden was completely redesigned and laid out. The owner’s hobby dream, a small bar of his own, was realised in the spacious bathhouse in the form of a “Pond Taproom”. This created a meeting place, not only for the family but also for friends and neighbours.


swimming-training-at-the-farm-2
swimming-training-at-the-farm-3
swimming-training-at-the-farm-4

Catalogus bestellen



Video's bekijken